Accessibility Upgrades and Boiler Room Renovation at CEA St-Pascal
Centre de services scolaire de Kamouraska - Rivière-du-Loup · Awarded contract
AwardedAccessibility Upgrades and Boiler Room Renovation at CEA St-Pascal
Awarded Unknown
AwardedNot specified
Value$818,728.24
SupplierMARCEL CHAREST ET FILS INC.
ProvinceQuebec
CategoryConstruction
Ended 3y 4mo ago
Award date unknownExpired 14 July 2023
About
Centre de services scolaire de Kamouraska - Rivière-du-Loup awarded a contract to MARCEL CHAREST ET FILS INC.
for accessibility corrections and boiler room renovation at CEA St-Pascal, valued at CAD 818,728.24.
Similar open tenders12
TenderCloses
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Mechanical Room Renovation – École Notre-Dame-du-bon-ConseilConstruction
26 Nov 2026
Refurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Construction
30 Nov 2026
Laboratory Refurbishment and Accessibility Upgrades – Laurentian Forestry Centre, Quebec CityConstruction
02 Dec 2026
Renovation of Science Rooms (Phase 1) and EHDAA Sector Level 200 — Polyvalente La Samare, PlessisvilleConstruction
26 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Interior Reconfiguration, Cladding and Window Repairs — Centre Éducation des Adultes des Patriotes (CEAP) Marie-VictorinConstruction
01 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Science Laboratory Upgrade – École Gilbert-Théberge, TémiscamingConstruction
03 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





