Agronomist Support for Agricultural Drainage on Highway 35 Extension Phase III-B
Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedAgronomist Support for Agricultural Drainage on Highway 35 Extension Phase III-B
Awarded 22 Sep 2021
Awarded22 Sep 2021
Value$33,571.94
SupplierGROUPE PLEINETERRE INC.
ProvinceQuebec
CategoryAgriculture & Farming
Ended 3y 3mo ago1y 11mo term
Awarded 22 Sept 2021Expired 1 Sept 2023
About
The Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) awarded a contract to Groupe Pleineterre Inc.
for agronomist support for agricultural drainage as part of the Highway 35 extension to the U.S.
border, phase III-B, between chemin Molleur in Pike-River and chemin Champlain.
The contract, valued at CAD 33,571.94, was awarded by mutual agreement under the environmental management category.
Similar open tenders12
TenderCloses
Remediation and 205m Drainage Channel Realignment — Rural Municipality of Montcalm (Manitoba)Water & Sanitation
01 Dec 2026
Mowing and Vegetation Cutting Along Highway 20 – Centre de services d'Ormstown (Montérégie)Infrastructure
10 Dec 2026
Cleaning of Drainage Elements (manholes, catch basins, pipes, culverts) – Saint-Jean-sur-Richelieu (Montérégie)Water & Sanitation
10 Dec 2026
Mowing and Cutting of Autoroute 35 Verges — South Sector, Saint-Jean-sur-Richelieu (Montérégie)Infrastructure
07 Dec 2026
Rue Giguère – Phase II & III Road, Sewer and Water Main Works with Retention BasinInfrastructure
07 Dec 2026
Replacement of Culverts 121690 and 159305 Using Trenchless Technique on A-15 at Prévost (Laurentides)Infrastructure
26 Nov 2026
Cleaning and Reprofiling of Ditch Beds and Culverts — Chemin Saint-EmmanuelInfrastructure
30 Nov 2026
Système de gestion des actifs de drainage et d’abord de route – Direction générale de la gestion des projets routiers et de l’encadrement en exploitationIT & Software
30 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Chemin Champagne Road Rehabilitation and East-side Ditch ReprofilingInfrastructure
23 Nov 2026
Mowing and Litter Removal Along Highways 20 and 55 – Urban Sector (Mauricie–Centre‑du‑Québec)Infrastructure
10 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open agriculture and farming tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





