Architectural Plans and Specifications for Phase 1 Washroom Renovation at École Bedford
Centre de services scolaire de Montréal / BDA · Awarded contract
AwardedArchitectural Plans and Specifications for Phase 1 Washroom Renovation at École Bedford
Awarded 24 Nov 2017
Awarded24 Nov 2017
Value$116,472.26
SupplierRayside Labossiere Architecte
ProvinceQuebec
CategoryConstruction
Ended 3y 8mo ago5y 4mo term
Awarded 24 Nov 2017Expired 28 Mar 2023
About
Centre de services scolaire de Montréal / BDA awarded a contract to Rayside Labossiere Architecte for architectural plans and specifications for Phase 1 of washroom renovations at École Bedford, valued at $116,472.26.
The contract was awarded through a non-competitive (sole-source) process.
Similar open tenders12
TenderCloses
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Renovation of Science Rooms (Phase 1) and EHDAA Sector Level 200 — Polyvalente La Samare, PlessisvilleConstruction
26 Nov 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Refurbishment of Toilet and Shower Room – Campus Félix-LeclercConstruction
30 Nov 2026
Renovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondConstruction
27 Nov 2026
Renovation of Teachers Preparation Room into Accessible Health Room – Ecole Belmont SchoolConstruction
11 Dec 2026
Gymnasium Roof Rehabilitation at École De Léry, BeaucevilleConstruction
01 Dec 2026
Haig Lake Fire Base Washhouse Conversion to Eight Single-Occupancy Bathrooms and Laundry RoomConstruction
23 Nov 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Red Deer Provincial Building – Barrier-Free Washroom Redesign (Abatement & Demolition)Construction
01 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





