Architectural Services for Drainage and Perimeter Insulation Replacement
Centre de services scolaire de Laval · Awarded contract
AwardedArchitectural Services for Drainage and Perimeter Insulation Replacement
Awarded 29 Sep 2026
Awarded29 Sep 2026
Value$76,000.00
SupplierCOHLMEYER ARCHITECTURE LIMITÉE
ProvinceManitoba
CategoryConstruction
About
Centre de services scolaire de Laval awarded a contract to COHLMEYER ARCHITECTURE LIMITÉE for professional architectural services related to the replacement of drainage and perimeter insulation.
The contract, valued at CAD 76,000, was awarded through a non-competitive (gré à gré) process under the temporary personnel – architecture category.
Similar open tenders12
TenderCloses
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Civil Engineering Professional Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Pipe Insulation Works at École Saint-Vincent-MarieConstruction
19 Nov 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Mechanical & Electrical Engineering Services for Building Envelope Renovation and Addition of Mechanical Ventilation – École primaire Léon‑Guilbault, Building 1Construction
09 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Exterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeConstruction
26 Nov 2026
Architectural Services for Construction of New Secondary School – Sainte-Catherine-de-la-Jacques-CartierConstruction
02 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





