Boiler Replacement at Centre de services scolaire du Val-des-Cerfs
Centre de services scolaire du Val-des-Cerfs · Awarded contract
AwardedBoiler Replacement at Centre de services scolaire du Val-des-Cerfs
Awarded 03 Jun 2020
Ended 5y 9mo ago9mo term
Awarded 3 June 2020Expired 3 Mar 2021
About
Centre de services scolaire du Val-des-Cerfs awarded a contract to Plombair Métalbec for the replacement of a boiler, valued at CAD 51,800.
The work falls under the category of installation or maintenance of electrical power systems.
Similar open tenders12
TenderCloses
Replacement of Natural Gas Boiler at École de l'ÉnergieConstruction
25 Nov 2026
Replacement of Town Hall Heating System Boiler (Chaudière)Construction
24 Nov 2026
Electromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstConstruction
26 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Remplacement des équipements électriques, génératrice d'urgence et réaménagement de la salle mécanique – École secondaire SoulangesConstruction
30 Nov 2026
Replacement of Domestic Hot Water Boiler – 108 L'EscaleConstruction
07 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Replacement and Addition of Furnaces and Hot Water Tank Replacement – 7500 avenue Goncourt, Anjou (2027)Construction
19 Nov 2026
Replacement of Boiler 075 – Foucher BuildingConstruction
07 Dec 2026
Fire Alarm System Replacement – École primaire St-MathieuPublic Safety & Security
15 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Boiler and Air Conditioning Replacement at Morden Collegiate Institute – Morden, ManitobaConstruction
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Boiler at Centre de services scolaire du Val-des-CerfsConstructionPlombair Métalbec
$51,800
Boiler Replacement at Centre de services scolaire des SommetsConstructionPlombair Métalbec
$28,840
Conversion of Oil Heating Systems to Electric Boilers for Centre de services scolaire du Val-des-CerfsEnergy & EnvironmentPlombair Métalbec
$243,730.27
Conversion of Oil Heating Systems to Electric Boilers for Centre de services scolaire du Val-des-CerfsConstructionPlombair Métalbec
$243,730.27
Boiler Replacement at Centre de services scolaire des SommetsConstructionMÉTALBEC LTÉE
$116,420
Boiler Replacement at Centre de services scolaire des SommetsConstructionMÉTALBEC LTÉE
$28,840
Boiler Overhaul at Centre de services scolaire du Val-des-CerfsConstructionPlomberie Briere inc.
$116,487.54
Replacement of Boilers at Centre de services scolaire du Val-des-CerfsConstructionACTIF
$103,992
Boiler Replacement at Centre de services scolaire des SommetsConstructionMÉTALBEC LTÉE
$116,420
Replacement of Electric Boiler at École Val-MauricieConstructionPlomberie CRT Therrien
$136,324.22
Replacement of Boilers at Baluchon and Val-de-Grâce SchoolsConstructionMÉTALBEC LTÉE
$253,028.7
Replacement of Natural Gas Boiler at Centre de services scolaire de la région de SherbrookeConstructionPlombair Métalbec
$194,453.17
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





