Ceramic and Resilient Flooring Installation for School Expansion in Chambly
SQI-Direction Gestion de projets Ouest du Québec (SQI-Gestion de projets Montréal CMO) · Awarded contract
AwardedCeramic and Resilient Flooring Installation for School Expansion in Chambly
Awarded Unknown
AwardedNot specified
Value$3,000,268.00
Supplier9028-4043 QUÉBEC INC.
ProvinceQuebec
CategoryConstruction
About
SQI-Direction Gestion de projets Ouest du Québec (SQI-Gestion de projets Montréal CMO) awarded a contract to 9028-4043 QUÉBEC INC.
for ceramic and resilient flooring installation as part of a secondary school space addition at 535, boulevard Brassard, Chambly, Québec.
The contract, valued at CAD 3,000,268, covers flooring services (couvre-planchers et parquets) and was awarded following a mandated purchase or group of organizations.
Similar open tenders12
TenderCloses
Flooring Installation at Multiple Santé Québec Capitale Nationale – Universitaire SitesConstruction
18 Nov 2026
Renovation of Gymnasium Floor and Surrounding Components – École de la Croisée des ChampsConstruction
10 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Hallway Flooring Replacement – Stony Plain Care Centre (approx. 25,000 sq ft)Construction
17 Dec 2026
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesConstruction
09 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Replacement of Flat Roof Covering (Phase 2) – École Ami-Joie (086)Construction
03 Dec 2026
Renovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondConstruction
27 Nov 2026
Refurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Construction
30 Nov 2026
Commercial-Grade Carpet Replacement – 3rd Floor, S-90 Stadacona (1926 sq yd)Construction
21 Dec 2026
Fire Alarm System Upgrade and Sprinkler Installation – École primaire Monseigneur-Gilles-GervaisConstruction
26 Nov 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





