CIPP Rehabilitation of Switzer Watermain and Valve Upgrades
Awarded 01 Apr 2025
About
The Town of Hinton awarded a contract to Robert B.
Somerville Co Ltd for the cured-in-place pipe (CIPP) rehabilitation of approximately 650 meters of existing ductile iron watermain from the Switzer Booster Station to the intersection of Switzer Drive and Robb Road, including removal and replacement of existing valves, installation of a new isolation valve on Robb Road with about 36 meters of ductile iron watermain replaced with PVC pipe, installation of a hot tap isolation valve on Switzer Drive, tree clearing at the Switzer Booster Station, and removal and replacement of all existing surface infrastructure disturbed by the work.
Provisional Schedule B work includes approximately 260 meters of CIPP trenchless rehabilitation from Robb Road and Mountain Street, valve replacements, about 20 meters of ductile iron watermain replaced with PVC pipe, and surface infrastructure restoration.
The contract value is CAD 1,809,520.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





