Claim Prevention and Analysis Support for Île-aux-Tourtes Bridge Reconstruction Project
Ministère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle) · Awarded contract
AwardedClaim Prevention and Analysis Support for Île-aux-Tourtes Bridge Reconstruction Project
Awarded 19 Feb 2026
Awarded19 Feb 2026
Value$1,658,250.00
SupplierMACOGEP INC.
AgencyMinistère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle)
ProvinceQuebec
CategoryConsultancy & Legal
Expires in 4y 3mo5y term, 15% elapsed
Awarded 19 Feb 2026Expires 19 Feb 2031
About
The Ministère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle) awarded a contract to MACOGEP INC.
for claim prevention and analysis support in the context of the Île-aux-Tourtes Bridge reconstruction project in the village of Senneville and the city of Vaudreuil-Dorion.
The contract, valued at CAD 1,658,250, covers administrative services or procedures.
Similar open tenders12
TenderCloses
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
Reconstruction of A-20 West in Concrete — Complex Bridge and Tunnel Construction & Repair (Chaudière-Appalaches)Infrastructure
07 Dec 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Repair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Infrastructure
10 Dec 2026
Prevention Works for Highly Retrogressive Landslides on Rivière à Veillet StreamInfrastructure
07 Dec 2026
Repair of Culvert P-03897 on Route 155 at Ruisseau de la Crique-Clair, La TuqueInfrastructure
23 Nov 2026
Reconstruction of Cameron Crescent, Métis and des Canots Avenues and Replacement of StreetlightsInfrastructure
07 Dec 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





