Construction of Cement Concrete Sidewalks at Parc Maisouna
Ville de Sorel-Tracy (approvisionnement) · Awarded contract
AwardedConstruction of Cement Concrete Sidewalks at Parc Maisouna
Awarded 16 Feb 2021
Ended 3y 10mo ago1y 11mo term
Awarded 16 Feb 2021Expired 24 Jan 2023
About
Ville de Sorel-Tracy (approvisionnement) awarded a contract to Danis construction inc.
for the construction of cement concrete sidewalks at Parc Maisouna, valued at CAD 70,132.91.
The contract covers sidewalk and curb construction and was awarded through a negotiated (gré à gré) process.
Similar open tenders12
TenderCloses
Paving, Curbs, Sidewalks and Public Lighting — Domaine des Prairies Phases 1 & 2Infrastructure
24 Nov 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Main Street (East) Sidewalk and Curb Accessibility Upgrade – Flin Flon, ManitobaInfrastructure
22 Jan 2027
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Construction of Footbridge at Parc de la Pointe du Bout d'en BasInfrastructure
30 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Reconstruction of Cameron Crescent, Métis and des Canots Avenues and Replacement of StreetlightsInfrastructure
07 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Road Pavement Rehabilitation on Multiple Streets in Montréal Boroughs ANJ, MHM, MTN and PMRInfrastructure
19 Nov 2026
On-Demand Contract for Short-Duration Work Zone Signage – Bas-Sainte-Laurent-Gaspésie--Îles-de-la-MadeleineInfrastructure
19 Nov 2026
Multifunctional Trail Development at Parc régional du Lac-MatapédiaInfrastructure
24 Nov 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far