Control and Regulation Systems for Phase 1 Heating Plant and Generator Building at Centre Intégré de Cancérologie – NCH
Société québécoise des infrastructures · Awarded contract
AwardedControl and Regulation Systems for Phase 1 Heating Plant and Generator Building at Centre Intégré de Cancérologie – NCH
Awarded 12 Oct 2018
About
The Société québécoise des infrastructures awarded a contract to Honeywell Ltée for control and regulation systems and maintenance for Phase 1 of the heating plant and generator building at the Centre intégré de cancérologie – NCH, located at 141, 18e Rue, Québec.
The contract, valued at CAD 7,449,400, falls under the plumbing, heating, and air conditioning category and was awarded following a mandated purchase or group of organizations.
Similar open tenders12
TenderCloses
Renovation of Units 2A, 3A and 4A at CHRL — Building Works, HVAC, Electrical and Fire DetectionConstruction
25 Nov 2026
Maintenance, Repair and Commissioning of Building Systems – Chicoutimi/Saint-Honoré Airport (Saint-Honoré)Infrastructure
07 Dec 2026
Heating System Conversion and Asset Maintenance — 224-226 boulevard Gérard-D.-Levesque, New Carlisle (Québec)Construction
26 Nov 2026
Control, Regulation and Automation of CVAC Systems for McGill New Vic – Buildings A, E, L, N (Lot 2502, Phase 2)Construction
03 Dec 2026
Installation de nouvelles chaudières — chaufferie de l'ancien hôpital Royal Victoria, 687 avenue des Pins Ouest, Montréal (Phase B)Construction
23 Nov 2026
Replacement of Town Hall Heating System Boiler (Chaudière)Construction
24 Nov 2026
On-Demand Contract for Capital Works and Medical Equipment Installation — HEJ, HSFA, HSS & Santé Québec HQ (CHU de Québec – Université Laval)Construction
01 Dec 2026
Fire Life Safety Systems Installation — Dr. Gendreau Personal Care Home, Ste. Rose Health Centre, and McCreary/Alonsa Personal Care Home and Health CentreConstruction
24 Nov 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Pre-purchase of 2 Boilers for Project 130212 — Replacement of Boiler No.1 Phase 1, Hôpital du SuroitEnergy & Environment
30 Nov 2026
HRV Interior Systems for New VIC Project – McGill University (Pavilions A, E, L, N) Lot 0920Construction
02 Dec 2026
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far