Curb and Sidewalk Installation for Domaine du Boisé Parking Development
Municipalité de Boischatel · Awarded contract
AwardedCurb and Sidewalk Installation for Domaine du Boisé Parking Development
Awarded Unknown
AwardedNot specified
Value$55,410.94
SupplierJEAN LECLERC EXCAVATION INC.
ProvinceQuebec
CategoryConstruction
About
Municipalité de Boischatel awarded a contract to JEAN LECLERC EXCAVATION INC.
for the installation of curbs and sidewalks as part of the parking development at Domaine du Boisé, under a negotiated contract valued at CAD 55,410.94.
Similar open tenders12
TenderCloses
Paving, Curbs, Sidewalks and Public Lighting — Domaine des Prairies Phases 1 & 2Infrastructure
24 Nov 2026
Réfection du stationnement D'Youville – 965, place D'Youville, QuébecConstruction
30 Nov 2026
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Réaménagement des deux patinoires extérieures — Parc Eugène‑Dostie, L'Île‑Bizard‑Sainte‑GenevièveConstruction
10 Dec 2026
Road and Parking Lot Sweeping for Centre de services de Saint-Jean-sur-Richelieu (Montérégie)Energy & Environment
02 Dec 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Paving and Roadway Resurfacing Works on Boulevard BrassardInfrastructure
30 Nov 2026
On-Demand Contract for Short-Duration Work Zone Signage – Bas-Sainte-Laurent-Gaspésie--Îles-de-la-MadeleineInfrastructure
19 Nov 2026
Development of Dock/Landing at École du Carrefour-des-Lacs — Civil Engineering WorksInfrastructure
25 Nov 2026
Construction of Climbing Wall, Reading Area and Play Modules – Jonathan-Wilson Park, L'Île-Bizard–Sainte-GenevièveConstruction
03 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Paving of Domaine du Boisé Parking Lot by Pavage S.M. Inc.InfrastructurePavage S.M. Inc.
$32,809.27
Paving of Domaine du Boisé Parking LotConstructionPavage S.M. Inc.
$35,071.97
Paving of Domaine du Boisé Parking LotConstructionPavage F&F inc.
$67,759.37
Parking Area Development at Domaine du BoiséConstructionFORTIER 2000 LTÉE
$26,909.89
Sidewalk and Curb Construction and Repair in Ville de QuébecInfrastructureJEAN LECLERC EXCAVATION INC.
$114,339
Construction of Sidewalk at Domaine Royal Sud by Jean Leclerc ExcavationConstructionJean Leclerc Excavation INC.
$49,525.64
Sidewalk and Curb Construction and Repair in Ville de QuébecInfrastructureJEAN LECLERC EXCAVATION INC.
$26,967
Parking Lot Development at Domaine du BoiséConstructionFORTIER 2000 LTÉE
$26,909.9
Sidewalk, Curb, and Slab Work in Ville de QuébecInfrastructureJEAN LECLERC EXCAVATION INC.
$1,438,988
Sidewalk, Curb, and Slab Works in Ville de QuébecInfrastructureJEAN LECLERC EXCAVATION INC.
$1,689,356.42
Concrete Curb and Sidewalk Works in Saint-Jean-sur-RichelieuInfrastructureBDL BORDURE ET TROTTOIR INC.
$109,858.61
Supply and Installation of Concrete Curbs at Domaine des ParcsInfrastructureInter-Cité Construction Ltée
$84,194.3
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far