Design and Planning for Relocation of Overhead Power Line Along Outremont Site
Ville de Montréal / SIRR - Service des infrastructures du réseau routier · Awarded contract
AwardedDesign and Planning for Relocation of Overhead Power Line Along Outremont Site
Awarded 08 Jan 2019
Ended 7y 9mo ago1mo term
Awarded 8 Jan 2019Expired 19 Feb 2019
About
Ville de Montréal / SIRR - Service des infrastructures du réseau routier awarded a contract to HYDRO-QUEBEC for the design and planning of the relocation of an overhead power line along the Outremont site.
The contract, valued at CAD 30,673.08, was awarded through a non-competitive (negotiated) process.
Similar open tenders12
TenderCloses
Construction of New 230 kV Sectioning Substation — Poste Pierre-Laporte, MontérégieEnergy & Environment
20 Jan 2027
Renewal of Water Main Under the Rimouski River (TECQ)Water & Sanitation
25 Nov 2026
Montréal — Poste Des Sources (315/25 kV): Travaux de pérennité et mise à niveauEnergy & Environment
18 Dec 2026
Construction of up to 97 km 230 kV Transmission Line from Dorsey Convertor Station to Wash’ake Mayzoon Station — ManitobaInfrastructure
15 Dec 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Renovation of 1315 Notre Dame Avenue Building — Winnipeg (Manitoba Hydro)Construction
30 Nov 2026
Maintenance & Operation of Mechanical and Electrical Building Systems – Point-du-Jour Service Area (Lavaltrie)Infrastructure
10 Dec 2026
ECI Construction of New 315-25 kV Substations Toupin and SoulignyInfrastructure
21 Jan 2027
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far