Detailed Design and Construction Administration for South Coaldale Regional Stormwater Management Facility
Awarded 07 Nov 2024
About
The Town of Coaldale awarded a contract to MPE Engineering Ltd.
for detailed design and construction administration services for the South Coaldale Regional Stormwater Management Facility.
The work involves designing a retention pond (wet pond) based on the preferred design from the Malloy Drain Stormwater Improvements Feasibility Assessment (2023), including project management, stakeholder consultation with Alberta Transportation and ATCO Gas, evaluation of existing infrastructure, coordination of utility crossings, and compliance with Alberta environmental legislation and guidelines.
The contract value is $213,668.70.