Development of a Multi-Use Trail at Pointe-des-Américains
Ville d'Alma · Awarded contract
AwardedDevelopment of a Multi-Use Trail at Pointe-des-Américains
Awarded Unknown
AwardedNot specified
Value$1,826,688.00
SupplierEXCAVATION UNIBEC INC.
AgencyVille d'Alma
ProvinceQuebec
CategoryInfrastructure
About
Ville d'Alma awarded a contract to Excavation Unibec Inc.
for the development of a multi-use trail at Pointe-des-Américains, falling under the bike path category, with a contract value of $1,826,688.
Similar open tenders12
TenderCloses
Multifunctional Trail Development at Parc régional du Lac-MatapédiaInfrastructure
24 Nov 2026
On-Demand Trail Development and Maintenance Services – Parc du Mont-Sainte-AnneInfrastructure
11 Jan 2027
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Construction of Footbridge at Parc de la Pointe du Bout d'en BasInfrastructure
30 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Construction of Climbing Wall, Reading Area and Play Modules – Jonathan-Wilson Park, L'Île-Bizard–Sainte-GenevièveConstruction
03 Dec 2026
Road Pavement Rehabilitation on Multiple Streets in Montréal Boroughs ANJ, MHM, MTN and PMRInfrastructure
19 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Development of a Multi-Use Trail at Pointe-des-AméricainsInfrastructureEXCAVATION UNIBEC INC.
$1,725,112.11
Development of Access Path Connecting Rue Sainte-Anne to Multi-Use Trail at Pointe-des-AméricainsInfrastructure9023-4063 QUÉBEC INC.
$61,432.2
Construction of Access Path Linking Rue Sainte-Anne to Multi-Use Trail at Pointe-des-AméricainsInfrastructure9023-4063 QUÉBEC INC.
$50,267.46
Engineering Services for Phase 2 of the Multi-Use Trail along Pointe-des-AméricainsInfrastructureNorda Stelo Inc. (siège social)
$92,550.05
Engineering Services for Multiuser Trail Access to Pointe-des-Américains from Rue Ste-AnneInfrastructureNorda Stelo
$34,276.34
Construction of a Multi-Use Path on Rue de la Gare and Avenue LaroucheInfrastructureEXCAVATION BOULANGER
$515,047.53
Multipurpose Trail Construction at Pont Carcajou by Ville d'AlmaInfrastructureNORDA STELO INC.
$114,529.24
Construction of a Multi-Use Trail in Sainte-MélanieInfrastructurePAVAGE JD INC.
$507,673.79
Construction of a Multi-Use Trail in the Ruisseau Rouge and Rue Hubert-Reeves AreaInfrastructureLES ENTREPRISES ROSARIO MARTEL INC.
$1,664,838
Construction of a Multifunctional Path Between Daoust and L'Anse-à-l'Orme StreetsInfrastructureALI EXCAVATION INC.
$1,470,639.28
Development of Multifunctional Trail on Albert-Beaulne, Quatre-Saisons, and Jolicoeur StreetsInfrastructureLES PAVAGES THÉORÊT INC.
$259,143.56
Ecological Characterization and Concept Study for Phase 1 of the Pointe-des-Américains Multi-Use TrailConsultancy & LegalGroupe Synergis
$21,414.09
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





