Development of a Pedestrian Pathway on Route 117 in Sainte-Adèle
Ville de Sainte-Adèle · Awarded contract
AwardedDevelopment of a Pedestrian Pathway on Route 117 in Sainte-Adèle
Awarded Unknown
AwardedNot specified
Value$965,185.99
SupplierInter Chantiers inc.
AgencyVille de Sainte-Adèle
ProvinceQuebec
CategoryInfrastructure
About
Ville de Sainte-Adèle awarded a contract to Inter Chantiers inc.
for the development of a pedestrian pathway on Route 117, falling under the sidewalk and pedestrian trail category, with a contract value of $965,185.99.
Similar open tenders12
TenderCloses
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Upgrade of Pedestrian Crossings and FRCR Installation on Route 229 opposite INRS, VarennesInfrastructure
25 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Lighting Works for Cadieux Street Cycle PathInfrastructure
30 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Multifunctional Trail Development at Parc régional du Lac-MatapédiaInfrastructure
24 Nov 2026
Engineering Services for Rehabilitation of Rue Notre-Dame (Route 209) InfrastructureInfrastructure
18 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Construction of Pedestrian Pathway on Route 117 in Sainte-AdèleInfrastructureInter Chantiers Inc
$1,057,864.14
Construction of Pedestrian Crossing on Route 117 in Sainte-AdèleInfrastructureCONSTRUCTION MONCO INC.
$345,331.17
Construction of Pedestrian Crossing on Route 117 in Sainte-AdèleInfrastructureCONSTRUCTION MONCO INC.
$333,953.54
Engineering Studies, Plans and Specifications for Sidewalk Development on Route 117 in Sainte-AdèleInfrastructureEFEL Experts-conseils inc.
$46,909.8
Engineering Studies, Plans and Specifications for Sidewalk Development on Route 117 in Sainte-AdèleInfrastructureEFEL Experts-conseils inc.
$56,887.37
Development of a Pedestrian Trail along Chemin Ste-CatherineInfrastructureAménagement Sentiers Verts
$26,862.51
Construction of Pedestrian Trail in Sainte-Anne-de-la-RochelleInfrastructure2327-4152 QUEBEC INC.
$40,915.87
Rehabilitation of Pedestrian and Cycling Paths on Various Streets in Sainte-JulieInfrastructurePAYSAGES CHARBONNEAU INC.
$139,430.18
Construction of Pedestrian Trail in Sainte-Anne-de-la-RochelleInfrastructure2327-4152 QUEBEC INC.
$40,915.87
Development of Pedestrian Trail along Chemin Ste-CatherineInfrastructureAménagement Sentiers Verts
$26,862.51
Development of Pedestrian Pathway near Marcel-Saint-Pierre ResidenceInfrastructureLES CONSTRUCTIONS ARGOZY INC.
$79,896.13
Construction of Pedestrian Sidewalks and Pathways in Village CoreInfrastructureGama consultant inc.
$132,221.25
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





