Engineering Design Services for Bridge P-04655 on 7e Rang, Saint-Adrien-d'Irlande
Ministère des Transports (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedEngineering Design Services for Bridge P-04655 on 7e Rang, Saint-Adrien-d'Irlande
Awarded 28 Sep 2018
Ended 4y 2mo ago3y 12mo term
Awarded 28 Sept 2018Expired 19 Sept 2022
About
The Ministère des Transports (Direction de l'administration des appels d'offres publics) awarded a contract to Pluritec ltée for the preparation of plans and specifications for bridge P-04655 located on 7e Rang in Saint-Adrien-d'Irlande, under the on-demand contract program 6603-17-GE01.
The contract, valued at CAD 119,527.9, falls under engineering services for transport infrastructure.
Similar open tenders12
TenderCloses
Construction of Bridge P-20696 on Rang Saint-Jérôme over Rivière Rémy, Baie-Saint-PaulInfrastructure
04 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Construction of Bridge P-19986 on Route 289 over Rivière Bleue (Rivière-Bleue)Infrastructure
19 Nov 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Professional Engineering Services for Municipal Infrastructure Construction in Canal Row (rang du Canal) SectorInfrastructure
15 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Construction of Footbridge at Parc de la Pointe du Bout d'en BasInfrastructure
30 Nov 2026
Repair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Infrastructure
10 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





