Engineering Services for Construction of Sanitary Block at Parc Rivière-du-Moulin, Chicoutimi
Ville de Saguenay · Awarded contract
AwardedEngineering Services for Construction of Sanitary Block at Parc Rivière-du-Moulin, Chicoutimi
Awarded 20 Feb 2025
Awarded20 Feb 2025
Value$47,657.14
SupplierBOUTHILLETTE PARIZEAU INC.
AgencyVille de Saguenay
ProvinceQuebec
CategoryConstruction
About
Ville de Saguenay awarded a contract to Bouthillette Parizeau Inc.
for professional engineering services related to the construction of a sanitary block at Parc Rivière-du-Moulin in the Chicoutimi borough.
The contract, valued at CAD 47,657.14, was awarded following an invitation-based call for tenders.
Similar open tenders12
TenderCloses
Cleaning and Maintenance of Sanitary Block at Parc des PionniersPublic Services & Welfare
26 Nov 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Professional Services for Rehabilitation of Underground Infrastructure at Pseudo‑Sanitary Pumping Station U372 (Blaireaux)Water & Sanitation
01 Dec 2026
Sanitary Maintenance for Centre Socioculturel – Édifice des Soeurs du Bon Conseil, Arrondissement de ChicoutimiPublic Services & Welfare
07 Dec 2026
Rue Giguère – Phase II & III Road, Sewer and Water Main Works with Retention BasinInfrastructure
07 Dec 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
Professional Engineering Services for Construction Supervision — Direction des études techniques, Arrondissement du Plateau-Mont-RoyalConsultancy & Legal
15 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Professional Engineering Services for Municipal Infrastructure Construction in Canal Row (rang du Canal) SectorInfrastructure
15 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





