Engineering Services for Reconstruction of Montée Monette Bridge over Saint-André Creek
Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedEngineering Services for Reconstruction of Montée Monette Bridge over Saint-André Creek
Awarded 05 Feb 2020
Ended 2y 10mo ago3y 12mo term
Awarded 5 Feb 2020Expired 31 Jan 2024
About
The Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) awarded a contract to CIMA+ for the preparation of hydraulic studies, preliminary designs, and preliminary and final plans and specifications for the reconstruction of the Montée Monette structure over Saint-André Creek in Montérégie.
The contract value is $215,957.15.
Similar open tenders12
TenderCloses
Construction of Bridge P-20696 on Rang Saint-Jérôme over Rivière Rémy, Baie-Saint-PaulInfrastructure
04 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
Construction of Bridge P-20111 on Hamon Street over the Nelson River — QuébecInfrastructure
25 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





