Engineering Services for Rue Pierre-George-Roy Infrastructure Rehabilitation
Ville de Saint-Augustin-de-Desmaures · Awarded contract
AwardedEngineering Services for Rue Pierre-George-Roy Infrastructure Rehabilitation
Awarded 04 May 2021
Ended 1y 10mo ago3y 9mo term
Awarded 4 May 2021Expired 21 Jan 2025
About
Ville de Saint-Augustin-de-Desmaures awarded a contract to FNX-INNOV inc.
for professional engineering services related to infrastructure rehabilitation work on Rue Pierre-George-Roy, valued at CAD 138,557.57.
Similar open tenders12
TenderCloses
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Repair of Structure P-08945 on Rue Saint-Henri over Boulevard Saint-Paul — SaguenayInfrastructure
07 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Professional Engineering Services for Construction Supervision — Direction des études techniques, Arrondissement du Plateau-Mont-RoyalConsultancy & Legal
15 Dec 2026
Rue Giguère – Phase II & III Road, Sewer and Water Main Works with Retention BasinInfrastructure
07 Dec 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





