Envelope and Window Refurbishment Phase 2 at École Mgr Labrie
Centre de services scolaire de la Moyenne-Côte-Nord · Awarded contract
AwardedEnvelope and Window Refurbishment Phase 2 at École Mgr Labrie
Awarded 10 Sep 2019
Ended 4y 6mo ago2y 9mo term
Awarded 10 Sept 2019Expired 25 May 2022
About
Centre de services scolaire de la Moyenne-Côte-Nord awarded a contract to DMG Architecture for the refurbishment of the building envelope and windows (Phase 2) at École Mgr Labrie.
The contract, valued at CAD 51,384.49, was awarded through a non-competitive (gré à gré) process under the architecture category.
Similar open tenders12
TenderCloses
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Exterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeConstruction
26 Nov 2026
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Envelope Refurbishment Phase 4 at École Louis-RielConstructionFenêtre Métropole inc.
$632,714.92
Exterior Envelope Refurbishment at École Mgr SchefferConstructionGROUPE D'INVESTISSEMENT ET DE DEVELOPPEMENT COMMUNAUTAIRE MECATINA INC.
$2,119,038
Exterior Envelope Refurbishment and Window Replacement at École Saint-Gabriel in Ville-MarieConstructionGUS Témiscamingue
$1,577,393.72
Exterior Envelope Refurbishment Phase 2 at Centre de services scolaire du Lac-TémiscamingueConstructionLes constructions N.G. Roy
$723,212.63
Architectural Services for Phase 2 Structure and Envelope Rehabilitation at École Mont-RoyalConstructionDMA architectes s.e.n.c.r.l.
$78,050.07
Exterior Envelope Refurbishment Phase 2 at Centre de services scolaire du Lac-TémiscamingueConstructionLes constructions N.G. Roy
$723,212.63
Exterior Envelope Refurbishment and Window Replacement at École Saint-Gabriel in Ville-MarieConstructionGUS Témiscamingue
$1,594,000
Architectural Services for Phase 2 Structure and Envelope Rehabilitation at École Mont-RoyalConstructionDMA architectes s.e.n.c.r.l.
$34,570
Envelope Renovation Phase 1 at École Charles-LemoyneConstructionCONSTRUCTIONS SENI INC.
$11,262,118
Exterior Envelope Refurbishment at École Mgr SchefferConstructionGROUPE D'INVESTISSEMENT ET DE DEVELOPPEMENT COMMUNAUTAIRE MECATINA INC.
$2,119,038
Architectural Services for Window and Exterior Cladding Renovation (Phase 2) at École St-Jean-de-BrébeufConstructionFCSD ARCHITECTURE + DESIGN INC.
$35,754.26
Building Structure and Envelope Refurbishment Phase 2 at Mont-RoyalConstructionConstruction MacBec.
$298,425
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





