Erosion Repair and Rehabilitation of Fisher Creek at Kilometre 10.704 in Southern Region
Alberta Transportation and Economic Corridors · Awarded contract
AwardedErosion Repair and Rehabilitation of Fisher Creek at Kilometre 10.704 in Southern Region
Awarded 17 Jul 2024
Ended 2y 1mo ago3mo term
Awarded 17 July 2024Expired 15 Oct 2024
About
Alberta Transportation and Economic Corridors awarded a contract to Devcon Inc.
for erosion repair and other work at Fisher Creek Rehabilitation, Kilometre 10.704 (EBL) in the Southern Region.
The scope included site preparation and restoration, total suspended soils testing, common excavation, heavy rock riprap, and brush layer supply and install, with the contractor supplying all materials.
The contract value was CAD 984,172.89 and the completion date was October 15, 2024.
Similar open tenders12
TenderCloses
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Riprap Improvements at Keho, Chain Lakes and Pine Coulee Reservoirs — AlbertaInfrastructure
25 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Replacement with Reinforced Concrete Box Culvert at Fisher River East Branch (PR 233, Fisher Branch)Infrastructure
24 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Engineering and Consulting Services for Telford Lake Stormceptors and Deer Creek Erosion Rehabilitation — City of LeducWater & Sanitation
04 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Canal Liner Replacement – Lethbridge Northern Headworks Main Canal (Sta. 60+000–63+675)Water & Sanitation
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far