Exterior Facade Renovation Phase 3 at École Polytechnique
École Polytechnique · Awarded contract
AwardedExterior Facade Renovation Phase 3 at École Polytechnique
Awarded Unknown
Ended 3y 6mo ago
Award date unknownExpired 31 May 2023
About
École Polytechnique awarded a contract to Les Entreprises Proteau et Garneau inc for the renovation of exterior facades as part of Phase 3 of the 2021 project, valued at CAD 655,103.87.
Similar open tenders12
TenderCloses
Exterior Building Envelope Upgrade – Polyvalente La Frontalière (Coaticook)Construction
03 Dec 2026
Exterior Refurbishment of Pool Envelope at Polyvalente LavigneConstruction
26 Nov 2026
Exterior Façade Rehabilitation – Blainville, LaurentidesConstruction
30 Nov 2026
Exterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeConstruction
26 Nov 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Restoration of Exterior Building Envelope – Polyvalente Montignac, Lac‑MéganticConstruction
03 Dec 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Interior Refurbishment of Garage Henri-Bourassa and Associated ÉdiculesConstruction
17 Dec 2026
Renovation of Science Rooms (Phase 1) and EHDAA Sector Level 200 — Polyvalente La Samare, PlessisvilleConstruction
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Exterior Facade Renovation Phase 3 at École PolytechniqueConstructionLes Entreprises Proteau et Garneau inc
$655,103.87
Roof Renovation Phase 6 at École Polytechnique's Main PavilionConstructionTOITURES TROIS ÉTOILES INC.
$1,647,127
Façade Rehabilitation of South Wall at Lassonde Pavilions, École PolytechniqueConstructionLES ENTREPRISES PROTEAU ET GARNEAU INC.
$747,800
Renovation of Exterior Envelope Phase 3 at École Des Grands-ÊtresConstructionConstruction Panache (2017)
$617,300.2
Renovation of Exterior Envelope Phase 3 at École Des Grands-ÊtresConstructionConstruction Panache (2017)
$561,480.39
Façade Renovation Phase 1 at Cégep de Sept-ÎlesConstructionConstruction Scremin et Beaulieu inc
$345,708.87
Façade Renovation Phase 1 at École nationale d'administration publiqueConstructionBRIQUETAL LTÉE
$237,686.97
Exterior Envelope Renovation at Polyvalente Forimont (Phase 3)ConstructionLES CONSTRUCTIONS RÉJEAN MADORE
$876,560.55
Exterior Envelope Refurbishment at Polyvalente Forimont – Phase 3ConstructionConstruction Rejean Madore inc.
$876,560.55
Facade Renovation Phase 1 at Cégep Vanier CollegeConstructionGroupe Balex inc.
$180,295.78
Architectural Fees for Phase 2 Facade Renovation at Poly. SayabecConstructionLES ARCHITECTES PROULX ET SAVARD INC.
$29,569
Façade Renovation at École polyvalente Arvida – Preparatory PhaseConstructionAMEC CONSTRUCTION INC.
$181,824.94
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





