Alberta Infrastructure · Awarded contract
Awarded

HVAC and Air Handling System Replacement at John E. Brownlee Building, Edmonton – Phase 2

Awarded 28 Nov 2025

View live tenders
Awarded28 Nov 2025
Value$6,698,000.00
ProvinceAlberta
CategoryConstruction
Expires in 1mo1y 1mo term, 89% elapsed
Awarded 28 Nov 2025Expires 1 Jan 2027

Alberta Infrastructure awarded a contract to Goldbar Contractors Inc.

for Phase 2 of HVAC equipment and air handling system replacement at the John E.

Brownlee Building in Edmonton.

The work includes replacing fans, fan motors, and motor VFDs for fans 1, 2, and 3; replacing the cooling coil and related piping; replacing glycol heating pumps and piping; replacing the heating water pump and piping; replacing the humidification system with a new system including softener and reverse osmosis; and integrating new equipment controls with the existing EMCS.

The contract value is CAD 6,698,000.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.