Awarded 28 Nov 2025
Awarded28 Nov 2025
Value$6,698,000.00
SupplierGoldbar Contractors Inc.
AgencyAlberta Infrastructure
ProvinceAlberta
CategoryConstruction
Expires in 1mo1y 1mo term, 89% elapsed
Awarded 28 Nov 2025Expires 1 Jan 2027
About
Alberta Infrastructure awarded a contract to Goldbar Contractors Inc.
for Phase 2 of HVAC equipment and air handling system replacement at the John E.
Brownlee Building in Edmonton.
The work includes replacing fans, fan motors, and motor VFDs for fans 1, 2, and 3; replacing the cooling coil and related piping; replacing glycol heating pumps and piping; replacing the heating water pump and piping; replacing the humidification system with a new system including softener and reverse osmosis; and integrating new equipment controls with the existing EMCS.
The contract value is CAD 6,698,000.
Similar open tenders12
TenderCloses
HVAC Upgrade and Natural-Gas Heat Pump Installation – Wild Rose Manor & Wild Rose Villas, Grande PrairieConstruction
26 Nov 2026
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Air Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierConstruction
26 Nov 2026
Design of Air-to-Water Heating/Cooling Replacement and Ventilation Upgrades – St. John’s Community Correctional CentreConstruction
02 Dec 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Renovation of Units 2A, 3A and 4A at CHRL — Building Works, HVAC, Electrical and Fire DetectionConstruction
25 Nov 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
HVAC Unit Refurbishment – CÉGEP de Rimouski Floors A-300 & A-400 (Tender 890-2627-11)Construction
08 Dec 2026
HRV Interior Systems for New VIC Project – McGill University (Pavilions A, E, L, N) Lot 0920Construction
02 Dec 2026
WCB Millard Health Mechanical Room Dedicated Cooling System UpgradeConstruction
19 Nov 2026
Mechanical and Electrical Renewal of Air Handling Units AHU 1, AHU 2 and EF – YMCAConstruction
07 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far