HVAC Upgrade at Mgr Richard Building, Galt Edition
Centre de services scolaire Marguerite-Bourgeoys · Awarded contract
AwardedHVAC Upgrade at Mgr Richard Building, Galt Edition
Awarded 07 Apr 2020
Awarded07 Apr 2020
Value$485,602.38
SupplierL'heureux Mongeau J.C. Lauzon
ProvinceQuebec
CategoryConstruction
Ended 5y 10mo ago10mo term
Awarded 7 Apr 2020Expired 22 Jan 2021
About
Centre de services scolaire Marguerite-Bourgeoys awarded a contract to L'heureux Mongeau J.C.
Lauzon for the upgrade of heating, ventilation, and air conditioning (HVAC) systems at the Mgr Richard building, Galt edition.
The contract, valued at CAD 485,602.38, falls under building services, construction, and maintenance.
Similar open tenders12
TenderCloses
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Mechanical & Electrical Engineering Services for Building Envelope Renovation and Addition of Mechanical Ventilation – École primaire Léon‑Guilbault, Building 1Construction
09 Dec 2026
Electromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstConstruction
26 Nov 2026
Air Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierConstruction
26 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Parc national de la Gaspésie – Roof Refurbishment and Rooftop Air Conditioning Unit Replacement at Centre de découverte et de servicesConstruction
03 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Heating System Conversion and Asset Maintenance — 224-226 boulevard Gérard-D.-Levesque, New Carlisle (Québec)Construction
26 Nov 2026
Fire Alarm System Upgrade and Sprinkler Installation – École primaire Monseigneur-Gilles-GervaisConstruction
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
HVAC Upgrade at Mgr Richard Building, Éd. GaltConstructionL'heureux Mongeau J.C. Lauzon
$485,602.38
HVAC Upgrade at Centre de services scolaire Marguerite-Bourgeoys Head OfficeConstructionVentilation Jean Roy 1999 Inc.
$839,890.63
HVAC Upgrade at Centre de services scolaire Marguerite-Bourgeoys Head OfficeConstructionVENTILATION JEAN ROY (1999) INC.
$839,890.63
HVAC System Upgrades at École Saint-Laurent (Saint-Germain Building)ConstructionCONSTRUCTION MICHEL GAGNON LTÉE
$723,927.71
HVAC System Upgrades at École Saint-Laurent (Saint-Germain Building)ConstructionCONSTRUCTION MICHEL GAGNON LTÉE
$723,927.71
HVAC Upgrade at École Terre-des-Jeunes by Centre de services scolaire Marguerite-BourgeoysConstruction9326-0719 Québec inc.
$836,715.16
HVAC Upgrade at CEA Jeanne-Sauvé, Saint-Jean BuildingConstructionNÉVÉ RÉFRIGÉRATION INC.
$898,200
Upgrade of Heating, Electrical Entry, Ventilation, and Air Conditioning at École des Saules-RieursConstructionCorrado Entrepreneur Général
$1,030,000
HVAC Upgrade at CEA Jeanne-Sauvé, Saint-Jean BuildingConstructionNÉVÉ RÉFRIGÉRATION INC.
$898,200
HVAC Upgrade at École Saint Gérard by Concept P.V.R. Inc.ConstructionConcept P.V.R. Inc.
$378,430
HVAC and Ventilation Upgrade at École LacroixConstructionCONSTRUCTION JL GROLEAU INC.
$2,371,665.89
HVAC Upgrade at CEA LaSalle Clément BuildingConstructionTUYAUTERIE EXPERT INC.
$539,390.77
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





