Hydrological and Hydraulic Study for Stormwater Separation and Retention Basin in Sainte-Adèle
Ville de Sainte-Adèle · Awarded contract
AwardedHydrological and Hydraulic Study for Stormwater Separation and Retention Basin in Sainte-Adèle
Awarded 18 Nov 2019
Awarded18 Nov 2019
Value$47,300.72
SupplierLASALLE | NHC INC.
AgencyVille de Sainte-Adèle
ProvinceQuebec
CategoryWater & Sanitation
Ended 6y 1mo ago12mo term
Awarded 18 Nov 2019Expired 30 Oct 2020
About
Ville de Sainte-Adèle awarded a contract to LASALLE | NHC INC.
for a hydrological and hydraulic study concerning the acceptability of the concept by the MELCC, related to stormwater separation and a retention basin on slopes 40-80.
The contract, valued at CAD 47,300.72, falls under engineering services.
Similar open tenders12
TenderCloses
Sanitary and Storm Sewer Separation – Phase 4 at 1200 Montreal Road, OttawaWater & Sanitation
24 Nov 2026
Rue Giguère – Phase II & III Road, Sewer and Water Main Works with Retention BasinInfrastructure
07 Dec 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
Cleaning of Drainage Elements (manholes, catch basins, pipes, culverts) – Saint-Jean-sur-Richelieu (Montérégie)Water & Sanitation
10 Dec 2026
Fabrication of Hot-Dip Galvanized Stilling Well Platform for Pointe-des-Cascades Hydrometric Station, Saint Lawrence River (Québec)Infrastructure
27 Nov 2026
Modifications and Maintenance of Domestic Sewer Infrastructure – Gentilly and Sainte-Angèle-de-LavalWater & Sanitation
03 Dec 2026
Construction and Removal of Clay Dike Closures for Flood Response – St. Jean Baptiste & Letellier, ManitobaInfrastructure
02 Dec 2026
Rehabilitation of Water, Sewer and Road Infrastructure on Loisirs and Vachon StreetsInfrastructure
19 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far