Inspection and Stability Verification of Confinement Dikes at East Sullivan Mining Site
Ministère des Ressources naturelles et des Forêts · Awarded contract
AwardedInspection and Stability Verification of Confinement Dikes at East Sullivan Mining Site
Awarded 25 Sep 2017
Awarded25 Sep 2017
Value$30,259.18
SupplierSNC-Lavalin Stavibel inc.
ProvinceQuebec
CategoryMining & Natural Resources
Ended 8y 5mo ago9mo term
Awarded 25 Sept 2017Expired 30 June 2018
About
Ministère des Ressources naturelles et des Forêts awarded a contract to SNC-Lavalin Stavibel inc.
for the inspection and stability verification of confinement dikes at the East Sullivan mining site.
The contract, valued at CAD 30,259.18, was awarded through a non-competitive (gré à gré) process under the mining engineering category.
Similar open tenders12
TenderCloses
Construction and Removal of Clay Dike Closures for Flood Response – St. Jean Baptiste & Letellier, ManitobaInfrastructure
02 Dec 2026
Geotechnical Assessment of Former Smoky River Coal Mine – Slope Stability Investigation (Grande Cache, AB)Mining & Natural Resources
18 Dec 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Compliance Upgrade Works for Neiges Dam – Réserve faunique des Laurentides, Côte‑de‑Beaupré (X0001423)Infrastructure
12 Jan 2027
Rock Face Stabilisation on Chemin de la RivièreInfrastructure
24 Nov 2026
Construction and Removal of Clay Dike Closures for Spring Flood Response — Morris and Aubigny, MBInfrastructure
01 Dec 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
On-Demand Televised Inspection of Sewer Pipes and Manholes – City of LavalWater & Sanitation
26 Nov 2026
Prevention Works for Highly Retrogressive Landslides on Rivière à Veillet StreamInfrastructure
07 Dec 2026
Construction and Removal of Clay Dike Closures near Emerson and West Lynne, ManitobaInfrastructure
30 Nov 2026
Framework Agreement for Professional Cost Estimating and Estimation Study Services for Municipal Projects – LavalConsultancy & Legal
03 Dec 2026
Remediation of Former Baker Patton Mine Site – Engineered Cover System, 31 km East of Flin Flon, ManitobaMining & Natural Resources
10 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open mining and natural resources tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far