Installation of Concrete Slabs at KM 46.9 on Route R-1005
Société de développement de la Baie-James · Awarded contract
AwardedInstallation of Concrete Slabs at KM 46.9 on Route R-1005
Awarded 05 Jul 2021
Awarded05 Jul 2021
Value$48,359.66
ProvinceQuebec
CategoryInfrastructure
Ended 5y 2mo ago2mo term
Awarded 5 July 2021Expired 10 Sept 2021
About
Société de développement de la Baie-James awarded a contract to LES NIVELAGES FORESTIERS L.B.
INC.
for the installation of concrete slabs at kilometer 46.9 on Route R-1005, a secondary road.
The contract, valued at CAD 48,359.66, was awarded through a negotiated (gré à gré) process.
Similar open tenders12
TenderCloses
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Repair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Infrastructure
10 Dec 2026
Construction Administration for Grading and Gravel Surfacing — Highway 915-01 (35.44 km from Highway 102)Infrastructure
15 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Township Road 374 Surfacing Structure Construction – 800 m Section West of Highway 41Infrastructure
26 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far