Installation of Heating System Pump for Centre de services scolaire de l'Or-et-des-Bois
CENTRE DE SERVICES SCOLAIRE DE L’OR-ET-DES-BOIS · Awarded contract
AwardedInstallation of Heating System Pump for Centre de services scolaire de l'Or-et-des-Bois
Awarded 21 Jun 2022
Awarded21 Jun 2022
Value$45,842.00
SupplierPLOMBERIE D. SÉVIGNY INC.
ProvinceQuebec
CategoryConstruction
Ended 4y 5mo ago1d term
Awarded 21 June 2022Expired 22 June 2022
About
Centre de services scolaire de l'Or-et-des-Bois awarded a contract to Plomberie D.
Sévigny Inc.
for the installation of a pump as part of heating system installation, repair, or maintenance, following an invitation-based call for tenders, valued at CAD 45,842.
Similar open tenders12
TenderCloses
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Replacement of Natural Gas Boiler at École de l'ÉnergieConstruction
25 Nov 2026
Pipe Insulation Works at École Saint-Vincent-MarieConstruction
19 Nov 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Fire Alarm System Upgrade and Sprinkler Installation – École primaire Monseigneur-Gilles-GervaisConstruction
26 Nov 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Montérégie / IREQ Laboratoire Haute Tension – Replacement of Chiller with Air-Source Heat PumpConstruction
04 Dec 2026
Replacement of Town Hall Heating System Boiler (Chaudière)Construction
24 Nov 2026
Réaménagement de la salle D-217 et installation d'une hotte – École secondaire des Grandes-MaréesConstruction
09 Dec 2026
Mechanical Room Renovation – École Notre-Dame-du-bon-ConseilConstruction
26 Nov 2026
Remplacement des équipements électriques, génératrice d'urgence et réaménagement de la salle mécanique – École secondaire SoulangesConstruction
30 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Heating Pumps at Centre de services scolaire de l'Or-et-des-BoisConstructionPlomberie d Sévigny
$14,800
Replacement of Pool Water Heater for Centre de services scolaire de l'Or-et-des-BoisConstruction9161-6219 QUÉBEC INC.
$11,990
Installation of a Pumping Station at École Saint-MarcWater & SanitationPLOMBERIE MARTIN PELLETIER INC.
$27,035.27
Replacement of Heating System at École Dollard-des-OrmeauxConstructionPlomberie Europe inc
$327,556.12
Replacement of Heating System at École Dollard-des-OrmeauxConstructionPlomberie Europe inc
$327,556.12
Installation of a Booster Pump by Plomberie Pierre Corbeil for Centre de services scolaire des SamaresConstructionPLOMBERIE PIERRE CORBEIL INC.
$91,021.52
Installation of Four New Pumps and Network Modification at École Notre-Dame-des-AngesConstruction9220-1276 QUÉBEC INC.
$26,595
Replacement of Electric Boilers in Various SchoolsConstructionPlomberie 2B inc.
$290,220
Replacement of Electric Boiler and Pump at Centre de services scolaire de Sorel-TracyConstructionLE GROUPE CEVEC INC.
$42,500
Heating System Upgrade at École St-Joseph in St-PamphileConstructionPlomberie Martin Pelletier Inc.
$296,930.46
Replacement of Electric Boiler at Centre de services scolaire du Fleuve-et-des-LacsConstructionPLOMBERIE MARTIN PELLETIER INC.
$33,300
Heating System Upgrade at École St-Joseph in St-PamphileConstructionPlomberie Martin Pelletier Inc.
$296,930.46
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





