Interior Finishing Replacement Phase 2 at École Notre-Dame
Centre de services scolaire de la Pointe-de-l'Île · Awarded contract
AwardedInterior Finishing Replacement Phase 2 at École Notre-Dame
Awarded Unknown
AwardedNot specified
Value$36,185.00
ProvinceQuebec
CategoryConstruction
About
Centre de services scolaire de la Pointe-de-l'Île awarded a contract to BERGERON THOUIN ASSOCIÉS ARCHITECTES INC.
for the replacement of interior finishing, phase 2, at École Notre-Dame.
The contract, valued at CAD 36,185, was awarded by mutual agreement (gré à gré) under the architecture category.
Similar open tenders12
TenderCloses
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesConstruction
09 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Renovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondConstruction
27 Nov 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
Mechanical Room Renovation – École Notre-Dame-du-bon-ConseilConstruction
26 Nov 2026
Interior Refurbishment of Garage Henri-Bourassa and Associated ÉdiculesConstruction
17 Dec 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Interior Finishing Replacement Phase 2 at École Saint-JosephConstructionBERGERON THOUIN ASSOCIÉS ARCHITECTES INC.
$63,631.25
Interior Finishing Replacement Phase 1 at École Adélard-DesrosiersConstructionBERGERON BOUTHILLIER INC.
$35,900
Interior Finishing Replacement at École Sainte-Marguerite-Bourgeoys, Phase 2ConstructionUN ARCHITECTURE INC.
$33,766.07
Interior Finishing Replacement at Centre de services scolaire de la Pointe-de-l'ÎleConstructionBERGERON THOUIN ASSOCIÉS ARCHITECTES INC.
$58,043.65
Interior Finishing Replacement Phase 2 at École Notre-DameConstructionSTANTEC EXPERTS-CONSEILS LTÉE
$28,460
Interior Finishing Replacement at Centre de services scolaire de la Pointe-de-l'ÎleConstructionBERGERON THOUIN ASSOCIÉS ARCHITECTES INC.
$58,043.65
Interior Finishing Replacement Phase 2 at École Notre-DameConstructionRALVEC CONSTRUCTION INC.
$462,107
Interior Finishing Replacement Phase 1 at École Cardinal-LégerConstructionCASONI ARCHITECTE (FIRME D'ARCHITECTE)
$43,596
Interior Finishing Replacement at École Notre-Dame – Phase 1ConstructionRalvec Construction Inc.
$366,175.39
Interior Finishing Replacement at École Sainte-GertrudeConstructionBERGERON BOUTHILLIER INC.
$34,790.2
Interior Finishing Replacement Phase 2 at École Cardinal-LégerConstructionTROICÉ CONSTRUCTION INC.
$779,122.65
Interior Finishing Replacement Phase 2 at École Cardinal-LégerConstructionTROICÉ CONSTRUCTION INC.
$779,122.65
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





