Interior Finishing Replacement Phase 4 at École Denise-Pelletier
Centre de services scolaire de la Pointe-de-l'Île · Awarded contract
AwardedInterior Finishing Replacement Phase 4 at École Denise-Pelletier
Awarded Unknown
AwardedNot specified
Value$887,000.00
SupplierRALVEC CONSTRUCTION INC.
ProvinceQuebec
CategoryConstruction
About
Centre de services scolaire de la Pointe-de-l'Île awarded a contract to RALVEC CONSTRUCTION INC.
for the replacement of interior finishes in Phase 4 at École Denise-Pelletier, valued at CAD 887,000.
Similar open tenders12
TenderCloses
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesConstruction
09 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Renovation of Science Rooms (Phase 1) and EHDAA Sector Level 200 — Polyvalente La Samare, PlessisvilleConstruction
26 Nov 2026
Interior Reconfiguration, Cladding and Window Repairs — Centre Éducation des Adultes des Patriotes (CEAP) Marie-VictorinConstruction
01 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Interior Renovation at 130 Route 138, Forestville, Québec (G0T 1E0)Construction
26 Nov 2026
Exterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeConstruction
26 Nov 2026
Renovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondConstruction
27 Nov 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Interior Finishing Replacement at École Denise-Pelletier – Phase 4ConstructionRALVEC CONSTRUCTION INC.
$887,000
Interior Finishing Replacement (Phase 2) at Centre de services scolaire de la Pointe-de-l'ÎleConstructionRALVEC CONSTRUCTION INC.
$717,000
Interior Finishing Replacement (Phase 2) at Centre de services scolaire de la Pointe-de-l'ÎleConstructionRALVEC CONSTRUCTION INC.
$717,000
Interior Finishing Replacement at École Notre-Dame – Phase 2ConstructionRALVEC CONSTRUCTION INC.
$530,167.62
Interior Finishing Replacement Phase 1 at École Notre-DameConstructionRalvec Construction Inc.
$366,175.39
Interior Finishing Replacement Phase 2 at École Notre-DameConstructionRALVEC CONSTRUCTION INC.
$462,107
Interior Finishing Replacement at École Denise-Pelletier, Phase 3ConstructionCONSTRUCTION IRÉNÉE PAQUET & FILS INC.
$1,040,287.47
Interior Finishing Replacement at École Adélard-Desrosiers, Phase 1ConstructionRALVEC CONSTRUCTION INC.
$720,950
Interior Finishing Replacement at École Adélard-Desrosiers, Phase 1ConstructionRALVEC CONSTRUCTION INC.
$720,950
Interior Finishing Replacement at École Denise-Pelletier, Phase 3ConstructionCONSTRUCTION IRÉNÉE PAQUET & FILS INC.
$1,040,287.47
Interior Finishing Replacement at École Secondaire de la Pointe-aux-TremblesConstructionRALVEC CONSTRUCTION INC
$1,117,717
Interior Finishing Replacement at École Notre-Dame – Phase 1ConstructionRalvec Construction Inc.
$366,175.39
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





