Interior Systems, Painting, and Accessories for Secondary School Expansion in Mirabel
Société québécoise des infrastructures · Awarded contract
AwardedInterior Systems, Painting, and Accessories for Secondary School Expansion in Mirabel
Awarded 10 Mar 2022
Awarded10 Mar 2022
Value$16,232,206.86
SupplierCONSTRUCTION MICHEL GAGNON LTÉE
ProvinceQuebec
CategoryConstruction
Ended 11mo ago3y 9mo term
Awarded 10 Mar 2022Expired 18 Dec 2025
About
The Société québécoise des infrastructures awarded a contract to Construction Michel Gagnon Ltée for Lot 901 – interior systems, painting, and accessories as part of a secondary school expansion in the Mirabel sector.
The contract, valued at CAD 16,232,206.86, was awarded following a mandated purchase or group of organizations.
Similar open tenders12
TenderCloses
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesConstruction
09 Dec 2026
Refurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Construction
30 Nov 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Interior Refurbishment of Garage Henri-Bourassa and Associated ÉdiculesConstruction
17 Dec 2026
Building Repairs and Maintenance at Barthélemy-Joliette Secondary SchoolConstruction
23 Nov 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Architectural Services for Construction of New Secondary School – Sainte-Catherine-de-la-Jacques-CartierConstruction
02 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Structural and Civil Engineering Services for New Secondary School – Sainte-Catherine-de-la-Jacques-CartierConstruction
02 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Renovation and Fit-Out Works for Mirabel City HallConstruction
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





