Landfill Area 1 Reclamation and Cut-Off Wall Restoration at Edmonton Waste Management Centre
Awarded 16 Mar 2026
About
City of Edmonton awarded a contract to Roadbridge Services Ltd for the construction of reclamation work for the site restoration of the cut-off wall at the Landfill's Area 1 of Edmonton Waste Management Centre (EWMC).
The work included mobilization and demobilization, work site management with temporary facilities and security, site grading to reestablish soil cover and liner including clay cap, subsoil, topsoil and seed, sheet flow drainage, incorporation of a recently constructed working pad into backfill, removal and repurposing of frost cap and berms, rescue of onsite stockpile materials and cleaning of slurry/mixing ponds, construction of a new all-weather access road around the site perimeter, hydroseeding throughout the site including along the riverbank, restoration of monitoring wells decommissioned during slurry wall construction, and installation of groundwater monitoring wells to verify the performance of the slurry cut-off wall.
The contract value was CAD 2,701,478.43.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





