Material Quality Control for Infrastructure Rehabilitation on Rue Notre-Dame
Ville de Repentigny · Awarded contract
AwardedMaterial Quality Control for Infrastructure Rehabilitation on Rue Notre-Dame
Awarded 08 May 2024
Awarded08 May 2024
Value$109,312.48
SupplierGROUPE ABS INC.
AgencyVille de Repentigny
ProvinceQuebec
CategoryInfrastructure
Ended 2y 5mo ago1mo term
Awarded 8 May 2024Expired 8 June 2024
About
Ville de Repentigny awarded a contract to GROUPE ABS INC.
for material quality control services related to infrastructure rehabilitation work on Rue Notre-Dame between Boulevard Prud'homme and Rue Saint-André.
The contract, valued at CAD 109,312.48, covers engineering services to ensure material compliance.
Similar open tenders12
TenderCloses
Quality and Materials Control Engineering Services — Underground Infrastructure Reconstruction, Saint-Sacrement & Sacré-CœurInfrastructure
20 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Material Quality Control for Maintenance Works on Honoré‑Mercier Bridge Structures P-03226 & P-03228 — Montréal and KahnawakeInfrastructure
30 Nov 2026
Quality Control of Soils and Materials for Reconstruction of Autoroute 20 Ouest with Concrete Pavement — Chaudière-AppalachesInfrastructure
07 Dec 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Major Rehabilitation of Boulevard Guimond Infrastructure — Roads, Water Pipes, Cables, and Road MarkingsInfrastructure
26 Nov 2026
Decontamination, Granular Replenishment and Paving of Rue des Bosquets and Rue des ÉrablesInfrastructure
30 Nov 2026
On-Demand Analyses of Construction Residual Materials for Road Works – Abitibi‑TémiscamingueEnergy & Environment
10 Dec 2026
Rehabilitation of Water, Sewer and Road Infrastructure on Loisirs and Vachon StreetsInfrastructure
19 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





