Office Partitioning and Door Installation at École Secondaire de la Ruche
Centre de services scolaire des Sommets · Awarded contract
AwardedOffice Partitioning and Door Installation at École Secondaire de la Ruche
Awarded 05 Aug 2024
Awarded05 Aug 2024
Value$59,637.28
SupplierALAIN LIZOTTE CONSTRUCTION INC.
ProvinceQuebec
CategoryConstruction
Ended 2y 2mo ago1mo term
Awarded 5 Aug 2024Expired 12 Sept 2024
About
Centre de services scolaire des Sommets awarded a contract to ALAIN LIZOTTE CONSTRUCTION INC.
for office partitioning and door installation at École Secondaire de la Ruche, under a construction, repair, and building maintenance services category.
The contract was awarded by mutual agreement (gré à gré) for a value of CAD 59,637.28.
Similar open tenders12
TenderCloses
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesConstruction
09 Dec 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Renovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondConstruction
27 Nov 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Building Repairs and Maintenance at Barthélemy-Joliette Secondary SchoolConstruction
23 Nov 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





