Pond Edge Erosion Repair and Landscape Rehabilitation at Fairmont Lake Park
Awarded 10 Dec 2024
About
City of Lethbridge awarded a contract to Bos Scapes Inc.
for pond edge erosion repair and landscape rehabilitation at Fairmont Lake Park, valued at CAD 449,638.4.
The work includes clay and topsoil fill, riprap around storm inlets and the boat launch, rebuilding the boat launch to City standards, replacing turf with dryland meadow mix and native flowers, and planting native wetland vegetation to improve bank stability and biodiversity.
The contractor is responsible for prime contractor duties, project management, mobilization, quality control, traffic and pedestrian accommodation, environmental requirements, tree protection, hydrovac utilities, turf stripping, topsoil stripping, irrigation adjustments, excavation, asphalt pathway removal and construction, boat launch construction, clay cap pond liner installation, native plant supply and installation, topsoil placement, sod placement, hydromulching, seeding, and a 2-year warranty.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





