Alberta Infrastructure · Awarded contract
Awarded

Prime Consultant Services for Corridor Gate Replacement at Peace River Correctional Centre

Awarded 29 May 2026

View live tenders
Awarded29 May 2026
Value$38,500.00
ProvinceAlberta
CategoryConsultancy & Legal
Expires in 8mo1y 2mo term, 41% elapsed
Awarded 29 May 2026Expires 30 July 2027

Alberta Infrastructure awarded a contract to Bouthillette Parizeau Inc.

(BPA) for prime consultant services related to the replacement of corridor gates in the main building of the Peace River Correctional Centre.

The contract, valued at CAD 38,500, covers professional consulting services for the project.

Similar open tenders12

Courtyard Renovation at Laval Immigration Holding Centre – General Contractor RFPConstruction
26 Nov 2026
Electrical Prime Consultant for Edmonton Law Courts – Courthouse Security and Holding Cell Lock UpgradesPublic Safety & Security
19 Nov 2026
Prime Consultant Services for Abatement & Building Renewal and Building Modification — Stony Plain Provincial Building and CourthouseConsultancy & Legal
24 Nov 2026
Prime Consultant Services for Exterior Envelope Repair — Pincher Creek Provincial BuildingConstruction
04 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Renovation of RCMP Detachment Building – Steinbach, ManitobaConstruction
27 Nov 2026
Feasibility Study for Milner Ridge Correctional Centre (MRCC) Wildfire Value Protection – Consulting Services (Manitoba)Consultancy & Legal
08 Dec 2026
Chip Seal, Crack Repair and Pavement Marking – Peace Region 2027 Seal Coat ProgramInfrastructure
02 Dec 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.