Professional Design and Supervision Services for Boulevard Monk Surface Redevelopment
Ville de Montréal · Awarded contract
AwardedProfessional Design and Supervision Services for Boulevard Monk Surface Redevelopment
Awarded 11 Nov 2019
Awarded11 Nov 2019
Value$224,839.61
SupplierGBi
AgencyVille de Montréal
ProvinceQuebec
CategoryInfrastructure
Ended 2y 2mo ago4y 10mo term
Awarded 11 Nov 2019Expired 19 Sept 2024
About
Ville de Montréal awarded a contract to GBi for professional design and supervision services for roadwork under the Boulevard Monk surface redevelopment and enhancement project, valued at CAD 224,839.61.
Similar open tenders12
TenderCloses
Major Rehabilitation of Boulevard Guimond Infrastructure — Roads, Water Pipes, Cables, and Road MarkingsInfrastructure
26 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Professional Engineering Services for Construction Supervision — Direction des études techniques, Arrondissement du Plateau-Mont-RoyalConsultancy & Legal
15 Dec 2026
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Renewal of Grand Boulevard Infrastructure — Paving and Civil Engineering WorksInfrastructure
11 Jan 2027
Refurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Construction
30 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Road Pavement Rehabilitation on Multiple Streets in Montréal Boroughs ANJ, MHM, MTN and PMRInfrastructure
19 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Design and Technical Assistance for Street Redevelopment on Former SMIC SiteInfrastructure
03 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





