Professional Engineering Services for Pool Controls and Gas Boiler Replacement at École de l'Horizon-Soleil
Centre de services scolaire de la Rivière-du-Nord · Awarded contract
AwardedProfessional Engineering Services for Pool Controls and Gas Boiler Replacement at École de l'Horizon-Soleil
Awarded Unknown
AwardedNot specified
Value$49,300.00
SupplierBOUTHILLETTE PARIZEAU INC.
ProvinceQuebec
CategoryConstruction
About
Centre de services scolaire de la Rivière-du-Nord awarded a contract to Bouthillette Parizeau Inc.
for professional engineering services related to correcting pool controls and replacing a gas boiler at École de l'Horizon-Soleil.
The contract, valued at CAD 49,300, was awarded through a non-competitive (negotiated) process under the engineering services category.
Similar open tenders12
TenderCloses
Replacement of Natural Gas Boiler at École de l'ÉnergieConstruction
25 Nov 2026
Mechanical & Electrical Engineering Services for Building Envelope Renovation and Addition of Mechanical Ventilation – École primaire Léon‑Guilbault, Building 1Construction
09 Dec 2026
Replacement of Pool Dehumidification, Ventilation and Emergency Generator – Cité-des-Jeunes CampusConstruction
30 Nov 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Mechanical and Electrical Engineering Services for Major Renovation of La Pommeraie and L’Aquarelle Primary SchoolsConstruction
24 Nov 2026
Replacement and Installation of Filters and Pumps – Chalet Roberval Outdoor PoolConstruction
30 Nov 2026
Consultant Design Services for École Boréale School Expansion — Happy Valley‑Goose Bay, NLConstruction
23 Nov 2026
Replacement of Boilers and Ancillary Equipment – North West Regional College, Meadow Lake (Saskatchewan)Construction
01 Dec 2026
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Consul School Hot Water Boiler Replacement – Chinook School Division (Consul, SK)Construction
03 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





