Rehabilitation of Culverts and Non-Compliant Embankments on Salluit Airport Access Road, Nord-du-Québec
Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedRehabilitation of Culverts and Non-Compliant Embankments on Salluit Airport Access Road, Nord-du-Québec
Awarded Unknown
AwardedNot specified
Value$6,248,998.28
SupplierGroupe Lapalme inc.
ProvinceQuebec
CategoryInfrastructure
About
The Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) awarded a contract to Groupe Lapalme inc.
for the rehabilitation of culverts and correction of non-compliant embankments on the access road to Salluit Airport in Nord-du-Québec.
The contract, valued at CAD 6,248,998.28, covers culvert refurbishment and embankment repairs to address non-conformities.
Similar open tenders12
TenderCloses
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Repair of Culvert P-03897 on Route 155 at Ruisseau de la Crique-Clair, La TuqueInfrastructure
23 Nov 2026
Cleaning and Reprofiling of Ditch Beds and Culverts — Chemin Saint-EmmanuelInfrastructure
30 Nov 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Replacement of Culverts 121690 and 159305 Using Trenchless Technique on A-15 at Prévost (Laurentides)Infrastructure
26 Nov 2026
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
On‑demand Repair of Road Safety Guardrails and Impact Attenuators — Boucherville Operations AreaInfrastructure
07 Jan 2027
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





