Rehabilitation of Philipsburg, Taylor, Dutch (Route 235) and Best Streets – Phase 1 in Bedford
Ville de Bedford · Awarded contract
AwardedRehabilitation of Philipsburg, Taylor, Dutch (Route 235) and Best Streets – Phase 1 in Bedford
Awarded 09 Jul 2025
Ended 1y ago4mo term
Awarded 9 July 2025Expired 8 Nov 2025
About
Ville de Bedford awarded a contract to Excavation St-Pierre et Tremblay Inc.
for the rehabilitation of Philipsburg, Taylor, Dutch (Route 235), and Best streets (Phase 1), under the infrastructure and civil engineering works category.
The contract value is CAD 3,293,951.57.
Similar open tenders12
TenderCloses
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Reconstruction of Culverts 52578 and P-20852 on Various Roads — Capitale-Nationale (Tender 7103-26-0006)Infrastructure
25 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Repair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Infrastructure
10 Dec 2026
Rehabilitation of Water, Sewer and Road Infrastructure on Loisirs and Vachon StreetsInfrastructure
19 Nov 2026
Major Rehabilitation of Boulevard Guimond Infrastructure — Roads, Water Pipes, Cables, and Road MarkingsInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





