Rehabilitation of Trunk #94 Sewer via CMAR with Whitson Contracting
Awarded 09 Oct 2024
About
Epcor awarded a contract to Whitson Contracting Ltd.
for the rehabilitation of Trunk #94 sewer using the Construction Management at Risk (CMAR) method.
The work includes installing approximately 115m of 300mm or 450mm diversion sewer by trenchless method, a 35m deep drop manhole tied into existing Trunk #95, a 12m deep manhole on existing Trunk #94, slip lining 79m of 2250mm oval-shaped Trunk #94 downstream portion, and rehabilitating an existing chamber beneath the Stadium building.
The CMAR delivery splits the project into Part 1 Services and Part 2 Construction Work, with the Construction Manager engaged early in design to foster a collaborative team.