Reinforcement of Olympic Stadium Pier Caps
About
Parc olympique awarded a contract to SOCONEX ENTREPRENEUR GÉNÉRAL INC.
for the reinforcement of the pier caps (tailloirs) at the Olympic Stadium, under the stadiums category, valued at CAD 149,600.
Similar open tenders12
TenderCloses
Replacement of Steel Protective Coating on Pont de la ConcordeInfrastructure
15 Dec 2026
Roof Refurbishment Works — Pavillon Olier, Hôtel-Dieu de MontréalConstruction
26 Nov 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Gymnasium Roof Rehabilitation at École De Léry, BeaucevilleConstruction
01 Dec 2026
Remplacement d'un ponceau sur le chemin de la Rivière‑RougeInfrastructure
20 Nov 2026
Enhancement of St-Constant Water Tower — Paving, Asphalting & Infrastructure WorksWater & Sanitation
03 Dec 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
Addition of a Second Ice Rink at Colisée Isabelle-BrasseurConstruction
30 Nov 2026
Réfection d'une section de toiture de l'Hôtel de ParlementConstruction
24 Nov 2026
Construction of Footbridge at Parc de la Pointe du Bout d'en BasInfrastructure
30 Nov 2026
Complete Renovation of Pool Facilities at Parc LecavalierConstruction
26 Nov 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





