Renovation of Boiler Room at École Saint-Étienne
Centre de services scolaire de Montréal / BDA · Awarded contract
AwardedRenovation of Boiler Room at École Saint-Étienne
Awarded 08 Dec 2021
Awarded08 Dec 2021
Value$1,815,000.00
SupplierPLOMBERIE CHARBONNEAU INC.
ProvinceQuebec
CategoryConstruction
Ended 3y 1mo ago1y 10mo term
Awarded 8 Dec 2021Expired 8 Oct 2023
About
Centre de services scolaire de Montréal / BDA awarded a contract to PLOMBERIE CHARBONNEAU INC.
for the renovation of the boiler room at École Saint-Étienne, covering plumbing, heating, and air conditioning work, valued at CAD 1,815,000.
Similar open tenders12
TenderCloses
Mechanical Room Renovation – École Notre-Dame-du-bon-ConseilConstruction
26 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Replacement of Natural Gas Boiler at École de l'ÉnergieConstruction
25 Nov 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Replacement of Town Hall Heating System Boiler (Chaudière)Construction
24 Nov 2026
Réaménagement de la salle D-217 et installation d'une hotte – École secondaire des Grandes-MaréesConstruction
09 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Mechanical & Electrical Engineering Services for Building Envelope Renovation and Addition of Mechanical Ventilation – École primaire Léon‑Guilbault, Building 1Construction
09 Dec 2026
Cold Room Renovation and Crack Repairs – École Paul Gérin-Lajoie D’OutremontConstruction
26 Nov 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Renovation of Boiler Room at École Saint-ÉtienneConstructionPLOMBERIE CHARBONNEAU INC.
$1,815,000
Renovation of Boiler Room and Electrical Entrance at École Notre-Dame-du-FoyerConstructionPLOMBERIE CHARBONNEAU INC.
$3,888,888
Renovation of Boiler Room and Electrical Entrance at École Notre-Dame-du-FoyerConstructionPLOMBERIE CHARBONNEAU INC.
$3,888,888
Replacement of Boilers at École Saint-Enfant-JésusConstructionPLOMBERIE CHARBONNEAU INC.
$592,890
Replacement of Two Boilers at Saint-Pierre SchoolConstructionPLOMBERIE CHARBONNEAU INC.
$239,970.09
Replacement of Two Boilers at Saint-Pierre SchoolConstructionPLOMBERIE CHARBONNEAU INC.
$227,900
Modernization of Boiler Room and Plumbing at École Honoré-MercierConstructionPLOMBERIE G & G LTÉE
$1,382,244.87
Boiler Room Overhaul Phase 2 at École Des Près-VertsConstructionPLOMBERIE CHARBONNEAU INC.
$440,000
Heating System Renovation and Controls Upgrade at École Notre-DameConstructionPLOMBERIE CHARBONNEAU INC.
$701,853.06
Refection of the Heating Plant at École aux Quatre-VentsConstructionPLOMBERIE CHARBONNEAU INC.
$164,000
Renovation of Boiler Room and Plumbing Fixtures at École Marie-de-l'IncarnationConstructionLe Groupe Centco inc
$1,091,075.65
HVAC Boiler Works Contract Awarded to Plomberie Charbonneau Inc. by Centre de services scolaire des Mille-ÎlesConstructionPLOMBERIE CHARBONNEAU INC.
$514,415
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





