Replacement of Boilers, Ventilation and Air Conditioning Units at Pavillon des Ormeaux
Ville de Trois-Rivières · Awarded contract
AwardedReplacement of Boilers, Ventilation and Air Conditioning Units at Pavillon des Ormeaux
Awarded 04 Sep 2018
Awarded04 Sep 2018
Value$209,053.96
SupplierPlomberie CRT Therrien
AgencyVille de Trois-Rivières
ProvinceQuebec
CategoryConstruction
Ended 6y 6mo ago1y 9mo term
Awarded 4 Sept 2018Expired 27 May 2020
About
Ville de Trois-Rivières awarded a contract to Plomberie CRT Therrien for the replacement of boilers, ventilation and air conditioning units at the Pavillon des Ormeaux, under the plumbing, heating and air conditioning category, valued at CAD 209,053.96.
Similar open tenders12
TenderCloses
Air Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierConstruction
26 Nov 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Upgrade of Ventilation Systems – Polyvalente La Frontalière, CoaticookConstruction
25 Nov 2026
Modification of Chilled Water Network – Cégep de Trois-Rivières, Pavillon des SciencesConstruction
10 Dec 2026
Parc national de la Gaspésie – Roof Refurbishment and Rooftop Air Conditioning Unit Replacement at Centre de découverte et de servicesConstruction
03 Dec 2026
Replacement and Addition of Furnaces and Hot Water Tank Replacement – 7500 avenue Goncourt, Anjou (2027)Construction
19 Nov 2026
Addition of Video Appearance Capability and Central Control Refurbishment – 7600 Boulevard Parent Nord, Trois-Rivières QCConstruction
10 Dec 2026
Installation de nouvelles chaudières — chaufferie de l'ancien hôpital Royal Victoria, 687 avenue des Pins Ouest, Montréal (Phase B)Construction
23 Nov 2026
Replacement of Town Hall Heating System Boiler (Chaudière)Construction
24 Nov 2026
Electromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstConstruction
26 Nov 2026
HVAC and Mechanical & Electronic Equipment Maintenance — Aréna d'OutremontConstruction
15 Dec 2026
Montérégie / IREQ Laboratoire Haute Tension – Replacement of Chiller with Air-Source Heat PumpConstruction
04 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Oil Boilers at Pavillon Jacques-CartierConstructionGabriel Miller - Entrepreneur Général
$170,466.38
Refection of the Boiler Room at Pavillon Pierre-BoucherConstructionPLOMBERIE C.R.T. THERRIEN INC.
$459,509.56
Refection of the Boiler Room at Pavillon Pierre-BoucherConstructionPLOMBERIE C.R.T. THERRIEN INC.
$499,485.71
Replacement of Air Conditioning Unit at Parc de la Rivière des Mille-Îles Welcome PavilionConstructionNÉVÉ RÉFRIGÉRATION INC.
$314,284.16
Replacement of 3 Heating Units for Ville de Rouyn-NorandaConstructionLes Industries Blais Inc.
$31,510.05
Replacement of HVAC System at Pavillon Gérard-MorinConstructionREFRIGERATION BELISLE INC.
$29,215.15
Supply of Ventilation Units for Water Treatment Plant by Ville de Trois-RivièresWater & SanitationClimatisation Bélanger
$162,689.62
Replacement of Two Gas Boilers with High-Efficiency Units at Pavillon du Lac-aux-CastorsEnergy & EnvironmentPLOMBERIE CHARBONNEAU INC.
$66,685.5
Replacement of Two Rooftop Air Conditioning Units at Pavillon Wilfrid-BastienConstructionMECANICAIR INC.
$78,951.4
Installation of Two Natural Gas Condensing Boilers for Ville de Trois-RivièresConstructionPLOMBERIE C.R.T. THERRIEN INC.
$95,417.75
Installation of Two Natural Gas Condensing Boilers for Ville de Trois-RivièresConstructionPLOMBERIE C.R.T. THERRIEN INC.
$95,417.75
Replacement of HVAC System at Pavillon Gérard-MorinConstructionREFRIGERATION BELISLE INC.
$29,215.14
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





