Replacement of HVAC Systems – Phase 1 at Collège de l'Horizon
Centre de services scolaire du Chemin-du-Roy · Awarded contract
AwardedReplacement of HVAC Systems – Phase 1 at Collège de l'Horizon
Awarded Unknown
AwardedNot specified
Value$2,115,000.00
SupplierA PLUS CONSTRUCTION INC.
ProvinceQuebec
CategoryConstruction
About
Centre de services scolaire du Chemin-du-Roy awarded a contract to A PLUS CONSTRUCTION INC.
for the replacement of HVAC systems – Phase 1 at Collège de l'Horizon (021), under the building construction, repair, and maintenance services category, valued at CAD 2,115,000.
Similar open tenders12
TenderCloses
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Independent Commissioning Authority Services – Modernization & Addition of 10 to 12 School of Vista Heights and Ecole De La Rose Sauvage, CalgaryConsultancy & Legal
14 Dec 2026
Boiler and Air Conditioning Replacement at Morden Collegiate Institute – Morden, ManitobaConstruction
26 Nov 2026
Replacement of Natural Gas Boiler at École de l'ÉnergieConstruction
25 Nov 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Air Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierConstruction
26 Nov 2026
Réaménagement de la salle D-217 et installation d'une hotte – École secondaire des Grandes-MaréesConstruction
09 Dec 2026
Montérégie / IREQ Laboratoire Haute Tension – Replacement of Chiller with Air-Source Heat PumpConstruction
04 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of HVAC Systems - Phase 1 at Collège de l'Horizon (021)ConstructionA PLUS CONSTRUCTION INC.
$2,280,071.05
Replacement of Ceilings and HVAC Systems Phase 1 at Collège de l'HorizonConstructionBLH Architectes inc.
$68,170.08
Replacement of Ceilings and HVAC Systems Phase 1 at Collège de l'HorizonConstructionBLH Architectes inc.
$106,367.64
Engineering Services for Ceiling and HVAC Replacement Phase 1 at Collège de l'HorizonConsultancy & LegalSTANTEC EXPERTS-CONSEILS LTÉE
$81,607.93
Engineering Services for Ceiling and HVAC Replacement Phase 1 at Collège de l'HorizonConstructionSTANTEC EXPERTS-CONSEILS LTÉE
$118,712.72
Replacement of HVAC Systems (Phase 1) at École des Grands-CheminsConstructionLE GROUPE CENTCO INC.
$218,937.93
Replacement of HVAC Systems – Phase 2 at École de la Clé-des-ChampsConstructionBANEXCO INC.
$724,000
Replacement of HVAC Systems (Phase 1) at École des Grands-CheminsConstructionLE GROUPE CENTCO INC.
$218,937.93
HVAC Upgrade and Ceiling Replacement at Les Estacades Building (Phase 1)ConstructionConstruction Danoco inc.
$1,172,348.28
HVAC System Replacement Phase 1 at École secondaire Saint-HenriConstructionLE GROUPE CENTCO INC.
$369,500
HVAC Replacement Phase 4 at Centre de services scolaires de la CapitaleConstructionLES ENTREPRISES QUÉBECHAB LTÉE
$1,746,054.74
Replacement of HVAC Systems at École de la Clé-des-Champs – Phase 2ConstructionBANEXCO INC.
$769,484.85
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





