Replacement of Stormwater Pipe on Chemin Maska at Rue Bourbon Intersection
Ville de Dunham · Awarded contract
AwardedReplacement of Stormwater Pipe on Chemin Maska at Rue Bourbon Intersection
Awarded 05 Sep 2023
About
Ville de Dunham awarded a contract to Excavation St-Pierre et Tremblay Inc.
for the replacement of a stormwater pipe on Chemin Maska at the intersection of Rue Bourbon.
The contract, valued at CAD 89,704.15, was awarded through a negotiated (gré à gré) process under the stormwater drainage category.
Similar open tenders12
TenderCloses
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Cleaning and Reprofiling of Ditch Beds and Culverts — Chemin Saint-EmmanuelInfrastructure
30 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Rehabilitation of Secondary Water Pipes by Chemisage and Roadworks in Montréal (MHM, MTN, RDP, RPP, STL)Water & Sanitation
19 Nov 2026
Cleaning of Drainage Elements (manholes, catch basins, pipes, culverts) – Saint-Jean-sur-Richelieu (Montérégie)Water & Sanitation
10 Dec 2026
Sewer Pipe Rehabilitation by Lining in City of Montréal — Boroughs LAC, LAS, LSO, VER, VIMWater & Sanitation
26 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Replacement of Culverts 121690 and 159305 Using Trenchless Technique on A-15 at Prévost (Laurentides)Infrastructure
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Stormwater Pipe on Chemin Maska at Rue Bourbon IntersectionWater & SanitationEXCAVATION ST-PIERRE ET TREMBLAY INC.
$89,704.15
Replacement of Stormwater Pipe in Saint-Alexandre-de-KamouraskaInfrastructureEXCAVATIONS DESCHÊNES & FILS INC.
$754,072.26
Replacement of Stormwater Pipe by Excavations Deschênes & Fils in Saint-Alexandre-de-KamouraskaInfrastructureEXCAVATIONS DESCHÊNES & FILS INC.
$754,072.26
Reconstruction of Stormwater Pipe on Avenue DumouchelInfrastructureLES EXCAVATIONS SUPER INC.
$489,177.81
Replacement of Stormwater Pipes Between Avenue de Lorraine and Walker WatercourseInfrastructureBERNARD SAUVE EXCAVATION INC.
$606,238.1
Replacement of Stormwater Pipes Between Avenue de Lorraine and Walker WatercourseInfrastructureBERNARD SAUVE EXCAVATION INC.
$528,512.83
Replacement of Stormwater Pipe on Chemin du SaultInfrastructureLES CONSTRUCTIONS EDGUY INC.
$572,903.44
Replacement of Stormwater Pipe on Rue Thomas-Wilson in Pintendre SectorInfrastructureExcavation Gérard Pouliot inc
$84,518.06
Replacement of Stormwater Pipes at École Sainte-Catherine-de-SienneConstructionMorand Excavation
$58,505
Replacement of Stormwater Pipes at École Sainte-Catherine-de-SienneConstructionMorand Excavation
$58,505
Replacement of Stormwater Pipe by Excavation Montpetit in Notre-Dame-de-l'Île-PerrotWater & SanitationEXCAVATION MONTPETIT INC.
$59,915
Replacement of a Culvert on Chemin des ÉrablesInfrastructureEXCAVATIONS BOURGOIN & DICKNER INC.
$321,590.82
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





