Replacement of Ventilation System in Block 9 at CHU Ste-Justine
CHU Ste-Justine · Awarded contract
AwardedReplacement of Ventilation System in Block 9 at CHU Ste-Justine
Awarded Unknown
About
CHU Ste-Justine awarded a contract to Roland Grenier Construction Limitée for the replacement of the ventilation system in Block 9, under the category of installation, maintenance, or repair of air conditioning systems.
The contract value is CAD 668,063.
Similar open tenders12
TenderCloses
Air Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierConstruction
26 Nov 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Replacement and Modernization of Corridor Ventilation, Domestic Hot Water and Garage Heating – 5500 6e Avenue, MontréalConstruction
02 Dec 2026
Replacement of Ventilation System at Police Station – Sainte-MoniqueConstruction
10 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Maintenance, Repair and Commissioning of Building Systems – Chicoutimi/Saint-Honoré Airport (Saint-Honoré)Infrastructure
07 Dec 2026
Replacement of Multiple Ventilation Units – Building HVAC SystemsConstruction
20 Nov 2026
Renovation of Units 2A, 3A and 4A at CHRL — Building Works, HVAC, Electrical and Fire DetectionConstruction
25 Nov 2026
Upgrade of Ventilation Systems – Polyvalente La Frontalière, CoaticookConstruction
25 Nov 2026
HRV Interior Systems for New VIC Project – McGill University (Pavilions A, E, L, N) Lot 0920Construction
02 Dec 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Electromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstConstruction
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Ventilation System, Block 9 at CHU Ste-JustineConstructionROLAND GRENIER CONSTRUCTION LIMITÉE
$668,063
Installation of a Ventilation Unit in Mechanical Rooms on the 8th Floor, Blocks 4 & 5 at CHU Sainte-JustineConstructionVentilation MFC
$1,832,967.66
Professional Mechanical and Electrical Services for Ventilation System Addition in Blocks 4 and 5 at CHU Ste-JustineConstructionBOUTHILLETTE PARIZEAU INC.
$174,869.31
Pre-Purchase of Ventilation Unit for CHU Ste-Justine Block 9 Level AHealth & MedicalIngénia Technologies Inc.
$897,000
Supply of Two Ventilation Units for CHU Ste-Justine Block 8 Floors 4 and 5Health & MedicalIngénia Technologies Inc.
$492,800
Pre-Purchase of Ventilation Unit for CHU Ste-Justine Block 9 Level AHealth & MedicalIngénia Technologies Inc.
$897,000
Supply of Two Ventilation Units for CHU Ste-Justine Block 8 Floors 4 and 5Health & MedicalIngénia Technologies Inc.
$492,800
Installation of HVAC Materials and Labour at CHU Ste-JustineConstructionVENTILABEC INC.
$40,029
Installation of Ventilation Unit in Mechanical Room A9 at CHUSJConstructionLE GROUPE CENTCO INC.
$1,358,615.14
HVAC Ventilation System Replacement at CHU Ste-Justine's Decelles FacilityConstructionLE GROUPE CENTCO INC.
$149,900
Construction of Mechanical Rooms and Air Distribution at CHU Ste-JustineConstructionCONSTRUCTION L. MORIN INC.
$1,014,174.37
Mechanical Room Fit-Out and Corridor Air Distribution at CHU Ste-JustineConstructionCONSTRUCTION L. MORIN INC.
$997,735.76
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far