Yellowhead County · Awarded contract
Awarded

Road Base and Paving at West Yellowhead Regional Landfill Approach

Awarded 15 Aug 2025

View live tenders
Awarded15 Aug 2025
Value$394,380.00
ProvinceAlberta
CategoryInfrastructure
Ended 1y 1mo ago3mo term
Awarded 15 Aug 2025Expired 30 Oct 2025

Yellowhead County awarded a contract to E Construction a Division of Colas Western Canada Inc.

for road improvements on approximately 250 meters of the West Yellowhead Regional Landfill approach road, from the entry gate southeast.

The work included minor grading, removal and salvage of gravel, subgrade preparation, granular basecourse, paving, removal and reinstallation of traffic signs, and topsoil and seeding.

The contract value was $394,380.

Similar open tenders12

Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Gravel Loading, Hauling and Spreading Contract (10,000–12,000 yds3) – 2027 Season – SE 31-09-12 W3M PitTransport & Logistics
03 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Loading, Hauling and Spreading 10,000 Cubic Yards of Gravel on Municipal Roads – R.M. of The Gap No. 39 (2027)Infrastructure
04 Dec 2026
Clay Capping and Traffic Gravel Placement – 724 West, RM of Maple Creek No. 111, SaskatchewanInfrastructure
02 Dec 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Waste Collection, Transportation and Disposal Services – Fundy National Park (01 Apr 2027–31 Mar 2030)Energy & Environment
03 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Installation of 3 km 900/1050 mm Wastewater Trunk and 2.6 km 600 mm Water Transmission Main between Nisku and BeaumontWater & Sanitation
30 Nov 2026
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
Winnipeg Airport West Lands Development Phase 2 — Roadworks & Underground UtilitiesInfrastructure
24 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.