Roof Replacement at École Marc-Favreau – Phase 2
Centre de services scolaire de Montréal / BDA · Awarded contract
AwardedRoof Replacement at École Marc-Favreau – Phase 2
Awarded 12 Apr 2022
Awarded12 Apr 2022
Value$2,254,059.00
ProvinceQuebec
CategoryConstruction
Ended 4y 5mo ago2mo term
Awarded 12 Apr 2022Expired 12 June 2022
About
Centre de services scolaire de Montréal / BDA awarded a contract to LES ENTREPRISES CLOUTIER & GAGNON (1988) LTÉE for the replacement of the roof at École Marc-Favreau, Phase 2, valued at CAD 2,254,059.
Similar open tenders12
TenderCloses
Replacement of Flat Roof Covering (Phase 2) – École Ami-Joie (086)Construction
03 Dec 2026
Gymnasium Roof Rehabilitation at École De Léry, BeaucevilleConstruction
01 Dec 2026
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Roof Renovation of Centre Administratif Monseigneur SignayConstruction
30 Nov 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Réaménagement de la salle D-217 et installation d'une hotte – École secondaire des Grandes-MaréesConstruction
09 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Roof Replacement at École Marc-Favreau – Phase 2ConstructionLES ENTREPRISES CLOUTIER & GAGNON (1988) LTÉE
$2,254,059
Roof Replacement Phase 2 at École des métiers de l'aérospatiale de MontréalConstructionLes Entreprises Cloutier & Gagnon (1988) Ltée
$1,409,358.68
Roof Replacement Phase 2 at École des métiers de l’aérospatiale de MontréalConstructionLes Entreprises Cloutier & Gagnon (1988) Ltée
$1,409,358.68
Roof Replacement at École Pierre-Dupuy – Phase 1ConstructionLES COUVERTURES ST-LÉONARD INC.
$2,178,400
Roof Replacement Phase 1 at École Pierre-Dupuy by Les Couvertures St-LéonardConstructionLES COUVERTURES ST-LÉONARD INC.
$2,178,400
Roof Replacement at École Monseigneur-Forget – Sections A1, A2, B1, B2 and CanopiesConstructionLES ENTREPRISES CLOUTIER & GAGNON (1988) LTÉE
$776,658.26
Architectural Fees for Roof Replacement at École Marc-FavreauConstructionANA Architecture inc.
$125,405.99
Roof Replacement at École de l'Escalade 2 by Construction Marc BolducConstructionCONSTRUCTION MARC BOLDUC INC.
$349,000
Roof Replacement at École Saint-FabienConstructionCOUVERTURE MONTRÉAL-NORD LTÉE
$1,348,975
Roof, Skylight, and Facade Renovation at École Marie-FaveryConstructionLES ENTREPRISES CLOUTIER & GAGNON (1988) LTÉE
$624,989.29
Roof Replacement at École de l'Escalade 2 by Construction Marc Bolduc Inc.ConstructionCONSTRUCTION MARC BOLDUC INC.
$363,013
Roof Replacement at École Saint-Fabien for Centre de services scolaire de MontréalConstructionCOUVERTURE MONTRÉAL-NORD LTÉE
$1,348,975
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





