Site Development at École Secondaire Joséphine-Dandurand – Sous les Pavés
Ville de Saint-Jean-sur-Richelieu · Awarded contract
AwardedSite Development at École Secondaire Joséphine-Dandurand – Sous les Pavés
Awarded 03 Sep 2026
Awarded03 Sep 2026
Value$35,067.38
ProvinceQuebec
CategoryConstruction
About
Ville de Saint-Jean-sur-Richelieu awarded a contract to Pépinière Jacques-Cartier (1984) Inc.
for site development work at École secondaire Joséphine-Dandurand under the 'Sous les pavés' project, covering paving, asphalting, and infrastructure construction.
The contract, valued at CAD 35,067.38, was awarded through a negotiated contract (contrat de gré à gré).
Similar open tenders12
TenderCloses
Structural and Civil Engineering Services for New Secondary School – Sainte-Catherine-de-la-Jacques-CartierConstruction
02 Dec 2026
Development of Dock/Landing at École du Carrefour-des-Lacs — Civil Engineering WorksInfrastructure
25 Nov 2026
Architectural Services for Construction of New Secondary School – Sainte-Catherine-de-la-Jacques-CartierConstruction
02 Dec 2026
Paving, Curbs, Sidewalks and Public Lighting — Domaine des Prairies Phases 1 & 2Infrastructure
24 Nov 2026
Pavement Rehabilitation of Boulevard Saint-Jean — south of Boulevard Hymus to Sedgefield AvenueInfrastructure
07 Dec 2026
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
Réaménagement des deux patinoires extérieures — Parc Eugène‑Dostie, L'Île‑Bizard‑Sainte‑GenevièveConstruction
10 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Schoolyard Phase 1 Construction at École Victor-ThérienConstructionLes Pavages D'Amour Inc.
$485,850.59
Paving Work at École St-Joseph de Chandler by Eurovia Québec ConstructionConstructionEurovia Québec Construction Inc.
$54,492.4
Phase 2 Schoolyard Construction at École George-Étienne-CartierConstructionLES PAVAGES ET TERRASSEMENTS ST-BRUNO INC.
$500,023.11
Paving Replacement Phase 1 at École Secondaire Daniel-JohnsonConstructionExcavation Patrice Couture Inc.
$388,000
Paving Replacement Phase 1 at École Secondaire Daniel-JohnsonConstructionExcavation Patrice Couture Inc.
$388,000
Schoolyard Beautification at École Joséphine-Dandurand (Beaulieu Building)ConstructionExcavation et Construction Gélinas Inc.
$63,202.93
Schoolyard Development at École Clé-du-Boisé by Pavage Scellant JiricoConstructionPAVAGE SCELLANT JIRICO INC.
$164,587.65
Redevelopment of Schoolyard and Parking Lot at École Sainte-Geneviève SudConstructionLes Pavages D'Amour Inc.
$959,422.54
Schoolyard Beautification at École La DauversièreConstruction2633-2312 Québec Inc. Aménagement Pavatech Arthier Construction
$148,000
Replacement of Parking Lot, Courtyard, Pedestrian Surfaces, and Underground Electrical Line at CEA Jeanne-Sauvé, DorvalConstructionPAVAGES D'AMOUR INC.
$1,762,800
Resurfacing of Jean XXIII School Courtyard PavementConstructionCONSTRUCTIONS GILLES PAQUETTE LTÉE
$203,783.37
Replacement of Parking Lot Paving at École Secondaire Daniel-Johnson, Phase 2ConstructionPAVAGE DES MOULINS INC.
$1,217,239
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far